Challenges & Pain Points
- To manage this load increase in winter, the grid operator faces a large investment for only a few months use.
Our Solution
- Installing the Ampacimon solution on this line granted a 40% increase in capacity of the existing line during winter months, and allows smooth operation during winter load peaks.
- DLR System installed Nov 2012 (just before season start): 4xSensors + Real-time Monitoring + Forecast
Outcome
- Smooth operation during winter load peaks
- After 4 years of monitoring, no reinforcement needed
- Avoided new line investment