Challenges & Pain Points
- Increasing import capacity within 2 months.
Our Solution
- Ampacimon’s ADR Sense modules were installed on 8 lines interconnecting the Belgian grid to the French and Dutch grids, resulting in 30-40% flow increase on these lines. ADR Horizon, when combined with real-time measurements, provides capacity availability forecasts 60 hours ahead, transmitting them to neighboring grids and to Coreso, the regional coordination body.